|
@@ -3,8 +3,9 @@
|
|
|
<em>v.net.alloc</em> allocates subnets for nearest centres (direction from
|
|
|
centre). Centre node must be opened (costs >= 0). Costs of centre node are
|
|
|
used in calculation. Supported are cost assignments for both arcs and nodes,
|
|
|
-and also different in both directions of a vector line. For areas cost will
|
|
|
-be calculated along boundary lines.
|
|
|
+and also different in both directions of a vector line. For areas, costs will
|
|
|
+be calculated along boundary lines. The input vector map for
|
|
|
+<em>v.net.alloc</em> needs to be prepared with <em>v.net operation=connect</em>.
|
|
|
|
|
|
<h2>NOTES</h2>
|
|
|
|